BIM-based building circularity assessment from the early design stages: a BIM-based framework for automating the building circularity assessment from different levels of a building’s composition and providing the decision-making support on the design of the circular building from the early design stages
- J. Zhai(Author)
Student thesis:
Studentthesis types
Master
Information
Thesis Award Date
29/09/2020Qualification Level
MasterOriginal Language
EnglishThesis Managed By
Supervisors
Qi Han (Supervisor 1), Information Systems in the Built Environment
Pieter Pauwels (Supervisor 2), Information Systems in the Built Environment
Mike M. van Vliet (External coach)
Pieter Pauwels (Supervisor 2), Information Systems in the Built Environment
Mike M. van Vliet (External coach)
Bibliographical Note
Afstudeerverslag.
