Skip to search boxSkip to navigationSkip to main content

Simple expressions for finding recovery system inventory control parameters

  • G.P. Kiesmüller
    ,
  • S. Minner
Output:
Contribution to journal
Article
Academic
Peer-review

Information

Output type

Output:
Contribution to journal
Article
Academic
Peer-review

Original language

English

Pages from-to (Number of pages)

Pages 83-88

Journal (Volume, Issue Number)

Journal of the Operational Research Society (Volume 54, Issue 1)

Publication milestones

  • Published - 2003

Publication status

Published - 2003

ISSN

0160-5682

Abstract

A ship is required to operate for a fixed mission period. Should a critical item of equipment fail at sea, the ship is subject to a costly event with potentially high risk to ship and crew. Given warning of a pending defect, the ship can try to return to port under its own power and thus attempt to avoid an at sea failure. Defects which lead to a failure are detected by inspection, and the task is to select the appropriate frequency of inspection to balance the number of occasions that a ship fails at sea and the number of preventive inspection based returns to port during a mission to correct a defect. The modelling entails using the delay time concept. Expressions are established for the expected number of preventive and failure returns over a mission, and an example given of a cost based balance to select an optimal inspection period. Although addressing ship reliability, the model has relevance to the mission reliability of any repairable equipment with remote main repair facilities.

Metrics

Metrics

Scopus
citations
48
SciVal
FWCI
0.67
SciVal
Author count
2
SciVal
Paper percentile
63
SciVal
citations
48

PlumX, opens in new tab

Captures
35
Citation count
48