Scheduling measurements and controls over networks, part II: Rollout strategies for simultaneous protocol and controller design
- ,
- ,
- J.P. Hespanha,
- C.J. Silvestre
Output:
Chapter in Book/Report/Conference proceeding
Conference contribution
Academic
Peer-reviewInformation
Output type
Output:
Chapter in Book/Report/Conference proceeding
Conference contribution
Academic
Peer-reviewOriginal language
EnglishPages from-to (Number of pages)
Pages 2042-2047Publication milestones
- Published - 2012
Publication status
Published - 2012
Place of publication
PiscatawayPublisher
Institute of Electrical and Electronics Engineers, United StatesISBN (Print)
978-1-4673-2102-0Host publication title
Proceedings of the American Control Conference (ACC 2012), 27-29 June 2012, Montreal, CanadaAbstract
We consider a networked control system where a plant is connected to a remote controller via a shared network that allows only one user to transmit at a given time. At each transmission time, the controller decides between sampling one of the plant's sensors or transmitting control data to the plant. We tackle the problem of simultaneously designing a policy for scheduling decisions and a policy for control inputs so as to optimize a quadratic objective. Using the framework of dynamic programming, we propose a rollout strategy by which the scheduling and control decisions are determined at each transmission time as the ones that lead to optimal performance over a given horizon assuming that from then on controller and sensors transmit in a periodic order and the control law is a standard optimal law for periodic systems. We show that this rollout strategy results in a protocol where scheduling decisions are based on the state estimate and error covariance matrix of a Kalman estimator, and must be determined on-line. We contrast the solution to this problem with the solution to the seemingly similar sensor scheduling problem where optimal scheduling decisions can be determined off-line. We highlight how the protocol obtained from the rollout algorithm can be implemented in a distributed way in broadcast networks. Moreover, it follows by construction of rollout algorithms that our proposed scheduling method can outperform any periodic scheduling of transmissions.
Metrics
Metrics
Scopus
citations
12
SciVal
FWCI
2.58
SciVal
Author count
4
SciVal
Paper percentile
90
SciVal
citations
12
SciVal
Top percentile
10
Download statistics
Download count
3
PlumX
Citation count
12
Captures
19