Skip to search boxSkip to navigationSkip to main content

Scheduling a batching machine

  • P. Brucker
    ,
  • A. Gladky
    ,
  • J.A. Hoogeveen
    ,
  • M.Y. Kovalyov
    ,
  • C.N. Potts
    ,
  • T. Tautenhahn
Output:
Book/Report
Report
Academic

Open access

Information

Output type

Output:
Book/Report
Report
Academic

Original language

English

Publication milestones

  • Published - 1997

Publication status

Published - 1997

Place of publication

Eindhoven

Publisher

Technische Universiteit Eindhoven

Publication series

  • Publication series name: Memorandum COSOR
    ISSN (Print): 0926-4493
    Volume: 9704

Abstract

We address the problem of scheduling n jobs on a batching machine to minimize regular scheduling criteria that are nondecreasing in the job completion times??. A batching machine is a machine that can handle up to b jobs simultaneously.?? The jobs that are processed together form a batch?? and all jobs in a batch start and complete at the same time.?? The processing time of a batch is equal to the largest processing time of any job in the batch.?? We analyze two variants:?? the unbounded model?? where b \geq n;?? and the bounded model?? where b ??<n.?? For the unbounded model??, we give a characterization of a class of optimal schedules??, which leads to a generic dynamic programming algorithm that solves the problem of minimizing an arbitrary regular cost function in pseudopolynomial time??. The characterization leads to more e??cient dynamic programming algorithms for speci??c cost functions??: a polynomial algorithm for minimizing the maximum cost,?? an O(??n^3)???? time algorithm for minimizing the number of tardy jobs,?? an O(??n^2) time algorithm for minimizing the maximum lateness??, and an O(??n log n)?? time algorithm for minimizing the total weighted completion time.?? Furthermore,?? we prove that minimizing the weighted number of tardy jobs and the total weighted tardiness are NP-hard problems??. For the bounded model,?? we derive an O(??n^{b(??b-1)})???? time dynamic programming algorithm for minimizing total completion time when b > 1; for the case with m di??fferent processing times, we give a dynamic programming algorithm that requires O(b^2 m^2 2^m)?? time.?? Moreover,?? we prove that due-date based scheduling criteria give rise to NP-hard problems??. Finally??, we show that an arbitrary regular cost function can be minimized in polynomial time for a fi??xed number of batches??.

Documents and Links

Final published version, 273.89 KB

Metrics

Metrics

Download statistics
Download count
1213