Real-time high-speed train rescheduling in case of a complete blockage
- S Zhan,
- L.G. Kroon,
- L.P. Veelenturf,
Output:
Contribution to journal
Article
Academic
Peer-reviewOpen access
Information
Output type
Output:
Contribution to journal
Article
Academic
Peer-reviewOriginal language
EnglishPages from-to (Number of pages)
Pages 182-201 (20 pages)Journal (Volume, Issue Number)
Transportation Research. Part B: Methodological (Volume 78)Publication milestones
- Published - 2015
Publication status
Published - 2015
ISSN
0191-2615Abstract
In this paper we describe how rolling stock and passenger connections in a cyclic railway timetable can be modeled in a flexible way within the model for the Periodic Event-Scheduling Problem (PESP). Usually, PESP models assume that the constraints for rolling stock or passenger connections specify in detail which trains should connect with each other. However, the flexibility described in this paper allows the model to choose which trains should connect with each other in a rolling stock or passenger connection. We express the connection times in a minimum matching of arriving and departing trains in terms of certain process time variables. We also describe an abstract framework demonstrating that, under certain conditions, the extra flexibility can be modeled purely in terms of PESP constraints. The concept of flexible rolling stock and passenger connections is illustrated by an example based on three intercity lines of Netherlands Railways.
Documents and Links
Final author version , 820.4 KB
Metrics
Metrics
Scopus
citations
191
SciVal
citations
192
SciVal
FWCI
4.40
SciVal
Author count
4
SciVal
Paper percentile
96
SciVal
Top percentile
5
Download statistics
Download count
366
PlumX, opens in new tab
Captures
113
Citation count
192
