Ranking Construction Project Characteristics
- R. Favie,
- G.J. Maas
Output:
Chapter in Book/Report/Conference proceeding
Conference contribution
Academic
Peer-reviewOpen access
Information
Output type
Output:
Chapter in Book/Report/Conference proceeding
Conference contribution
Academic
Peer-reviewOriginal language
EnglishPages from-to (Number of pages)
Pages 1-8Publication milestones
- Published - 2008
Publication status
Published - 2008
Publisher
International Council for Research and Innovation in Building and Construction (CIB), CanadaHost publication title
Proceedings CIB Transformation Through Construction, Dubai, November 2008Host publication editors
- K Carter
- S Ogunlana
- A Kaka
Related Event
Title
conference; CIB Transformation Through Construction; 2008-11-15; 2008-11-17
Description
CIB Transformation Through Construction
Event type
ConferenceDate
15/11/2008 - 17/11/2008Abstract
This paper is concentrated on ranking project characteristics in order to be able to choose the type of procurement method (such as Traditional or Design & Construct) that can best be used for the design and build stage of a construction project in the future. There are several project characteristics that are defined in literature. But which of these project characteristics are the most important ones? If we know that, a client, in the future, might be able to choose his procurement method better, because the project characteristics are the main criteria for selecting a procurement method. To reach this goal, the first step is to list the relevant project characteristics from literature and practice. The second step is to make these criteria measurable in order to be able to match the characteristics with the procurement method characteristics. This paper will include the relevant project characteristics and the ranking of those by comparing literature with practice. In the future the most relevant project characteristics can be compared with the characteristics of the existing procurement methods in order to be able to make the right choice for a procurement method.
Documents and Links
Final published version, 70.96 KB
Metrics
Metrics
Download statistics
Download count
374
