Skip to search boxSkip to navigationSkip to main content

Performance measurement and pay for performance

Output:
Chapter in Book/Report/Conference proceeding
Chapter
Academic
Peer-review

Information

Output type

Output:
Chapter in Book/Report/Conference proceeding
Chapter
Academic
Peer-review

Original language

English

Pages from-to (Number of pages)

Pages 349-370 (516 pages)

Publication milestones

  • Published - 2002

Publication status

Published - 2002

Place of publication

New York

Publisher

Wiley, United States, United Kingdom
0-471-87726-3

Host publication title

Psychological management of individual performance

Host publication editors

  • S. Sonnentag

Abstract

This chapter, which takes a (re)design perspective, focuses on the management of employees’ contributions to organisational goal attainment. The control loop for the self-regulation of task performance is used as a frame of reference. Several subsets of design requirements are described and related to the basic elements of a control loop, i.e. performance indicators, goals, feedback, and effector. Given that organisations use a number of control systems to further organisational performance, a special subset of design requirements emphasises the need of consistency between organisational control systems, such as the company’s appraisal and reward system. To illustrate our approach, two case studies are presented. The first case study evaluates, in a qualitative way, a variable reward system linked to a ProMES performance management system. The second case study demonstrates quantitatively the relevance of several design requirements for the experienced procedural and distributive justice of and the satisfaction with a collective bonus system.

Metrics

Metrics

Download statistics
Download count
2