Mitigation Controller: Adaptive Simulation Approach for Planning Control Measures in Large Construction Projects
- Omar Kammouh(corresponding author)(Corresponding author),
- Maria Nogal,
- Ruud Binnekamp,
- A.R.M. Wolfert
- Delft University of Technology
Output:
Contribution to journal
Article
Academic
Peer-reviewOpen access
Information
Output type
Output:
Contribution to journal
Article
Academic
Peer-reviewOriginal language
EnglishArticle number
04021093Journal (Volume, Issue Number)
Journal of Construction Engineering and Management (Volume 147, Issue 8)Publication milestones
- Published - 01/08/2021
Publication status
Published - 01/08/2021
ISSN
0733-9364Funding Details
This work is part of the research program D-to-MII (Design to Manage Interconnected Infrastructures) with Project No. 439.16.823, which is financed by the Dutch Research Council (NWO).
FunderFunding numbers
NWO
-Abstract
<p>Probabilistic Monte Carlo simulations are often used to determine a project's completion time given a required probability level. During project execution, schedule changes negatively affect the probability of meeting the project's completion time. A manual trial and error approach is then conducted to find a set of mitigation measures to again arrive at the required probability level. These are then implemented as scheduled activities. The mitigation controller (MitC) proposed in this paper automates the search for finding the most cost-effective set of mitigation measures using multiobjective linear optimization so that the probability of timely completion remains at the required level. It considers different types of uncertainties and risk events in the probabilistic simulation. Moreover, it removes the fundamental modeling error that exists in the traditional probabilistic approach by incorporating human control and adaptive behavior in the simulation. Its usefulness is demonstrated using an illustrative example derived from a recent Dutch construction project in which delay is not permitted. It is shown that the MitC is capable of identifying the most effective mitigation strategies allowing for substantial cost savings. </p>
Bibliographical Note
Funding Information:
This work is part of the research program D-to-MII (Design to Manage Interconnected Infrastructures) with Project No. 439.16.823, which is financed by the Dutch Research Council (NWO).
Documents and Links
Metrics
Metrics
Scopus
citations
8
Download statistics
Download count
203
SciVal
FWCI
0.44
SciVal
Author count
4
SciVal
Paper percentile
49
SciVal
citations
8
PlumX, opens in new tab
Captures
52
Citation count
8