Skip to search boxSkip to navigationSkip to main content

Joint optimization of spare parts inventory and service engineers staffing with full backlogging

  • S. Rahimi-Ghahroodi(corresponding author)(Corresponding author)
    ,
  • A. Al Hanbali
    ,
  • ,
  • M.A. Cohen
*Corresponding author for this work
  • University of Twente
    ,
  • King Fahd University of Petroleum and Minerals
    ,
  • University of Pennsylvania
Output:
Contribution to journal
Article
Academic
Peer-review

Information

Output type

Output:
Contribution to journal
Article
Academic
Peer-review

Original language

English

Pages from-to (Number of pages)

Pages 39-50 (12 pages)

Journal (Volume, Issue Number)

International Journal of Production Economics (Volume 212)

Publication milestones

  • Published - 01/06/2019

Publication status

Published - 01/06/2019

ISSN

0925-5273

Funding Details

This publication was made possible by the NPRP award [ NPRP 7-308-2-128 ] from the Qatar National Research Fund (a member of The Qatar Foundation). The statements made herein are solely the responsibility of the authors. Appendix A

Abstract

<p>We consider the integrated planning of spare parts and service engineers that are needed for serving a group of systems. These systems are subject to different failure types, and for each failure, a service engineer with the necessary spare part has to be assigned to repair the system. The service provider follows a backlogging policy with part reservations. That is, a repair request is backlogged if one of the required resources is not immediately available upon demand. Moreover, a spare part is reserved if the requested spare part is in stock but no service engineer is immediately available. The spare parts are typically slow-movers and are managed according to a base-stock policy. The objective is to jointly determine the stock levels and the number of service engineers to minimize the total service costs subject to a constraint on the expected total waiting times of the repair calls. For the evaluation of a given setting, we present an exact method (computationally feasible for small problems) and an accurate approximation. For the joint optimization, we present a greedy heuristic that efficiently produces close-to-optimal results. We test how the heuristic performs compared to the optimal solution and the separate optimization of spare parts and service engineers in an extensive numerical study. In a case study with 93 types of spare parts, we show that the solution of the greedy algorithm is always within 2% of the optimal solution and is up to 20% better than a separated optimization approach encountered in practice.</p>

Metrics

Metrics

Scopus
citations
24
SciVal
citations
24
SciVal
FWCI
1.36
SciVal
Author count
4
SciVal
Paper percentile
79

PlumX, opens in new tab

Captures
55
Citation count
24