Skip to search boxSkip to navigationSkip to main content

Ensuring public safety through proper earthing in low-voltage networks

Output:
Contribution to journal
Conference article
Academic
Peer-review

Open access

Information

Output type

Output:
Contribution to journal
Conference article
Academic
Peer-review

Original language

English

Pages from-to (Number of pages)

Pages 617-620 (4 pages)

Journal (Volume, Issue Number)

CIRED - Open Access Proceedings Journal (Volume 2017, Issue 1)

Publication milestones

  • Published - 01/10/2017

Publication status

Published - 01/10/2017

ISSN

2515-0855

Related Event

Title

24th International Conference and Exhibition on Electricity Distribution (CIRED 2017)

Event type

Conference

Date

12/06/2017 - 15/06/2017

Location

SSEGlasgowUnited Kingdom

Abstract

<p>Electrical network should have proper earthing (grounding) system for its reliable operation and for the safety of operating personnel and connected customers. Good earthing provides a suitable return path for the fault current when a short circuit occurs in the network. In a low-voltage (LV) network mainly terra-terra (TT) and terra-neutral (TN) type network configurations are commonly used. Depending on the agreement between the network operator and the customer, earthing at a customer's point of connection (POC) is provided by a dedicated earth conductor, combined network cable (PEN conductor), or via a separate earth electrode. When an earth retour path is broken or interrupted, it will not be able to provide earth retour circuit and can cause dangerous fault voltage at various exposed parts of the conducting circuit. In this paper, various LV network configurations are discussed. Further, a practical monitoring based case study is presented to analyze the diversity of earth resistance values for different LV network configurations. Also, guiding rules are given to define safe value of circuit impedance and earth resistance path for various configurations. Finally, a proposal is given to optimize the safety needs at a customer's POC.</p>

Metrics

Metrics

SciVal
citations
2
Scopus
citations
2
Download statistics
Download count
332
SciVal
Author count
2
SciVal
Paper percentile
28

PlumX, opens in new tab

Citation count
2
Social media
8
Captures
8