Skip to search boxSkip to navigationSkip to main content

A novel workflow to combine BIM and linked data for existing buildings

  • Mathias Bonduel
    ,
  • Maarten Vergauwen
    ,
  • Ralf Klein
    ,
  • Mads Holten Rasmussen
    ,
  • Katholieke Universiteit Leuven
    ,
  • Technical University of Denmark
    ,
  • Ghent University
Output:
Chapter in Book/Report/Conference proceeding
Conference contribution
Academic
Peer-review

Information

Output type

Output:
Chapter in Book/Report/Conference proceeding
Conference contribution
Academic
Peer-review

Host publication Subtitle

Proceedings of the 12th European Conference on Product and Process Modelling (ECPPM 2018), September 12-14, 2018, Copenhagen, Denmark

Original language

English

Pages from-to (Number of pages)

Pages 347-354 (8 pages)

Publication milestones

  • Published - 2018

Publication status

Published - 2018

Place of publication

London

Publisher

CRC Press
9780429506215

Host publication title

eWork and eBusiness in Architecture, Engineering and Construction

Host publication editors

  • Jan Karlshøj
  • Raimar Scherer

Related Event

Title

12th European Conference on Product and Process Modelling

Event type

Conference

Degree of recognition

International event

Date

12/09/2018 - 14/09/2018

Location

CopenhagenDenmark

Abstract

Combining conventional Building Information Modeling (BIM) tools and Linked Data technologies improves the options to connect building models to external datasets. Existing workflows in this regard expect a conventional BIM model - including object’s geometry - as a starting point. This paper presents a novel, alternative workflow oriented towards existing buildings, including an initial implementation. Modeling the building topology using the BOT ontology is done first, allowing a Linked Data modeler to enrich this initial graph from the start of a project without being dependent on a BIM with (detailed) geometry. Later, a conventional BIM - including objects’ geometry - of the existing building can be made, starting from the shared building topology. At the end of this more flexible workflow, both the initial RDF graph and the BIM-based RDF graph are directly connected to each other, combining both datasets.

Metrics

Metrics

Scopus
citations
19
SciVal
FWCI
3.94
SciVal
Author count
5
SciVal
Paper percentile
95
SciVal
citations
19
SciVal
Top percentile
5

PlumX, opens in new tab

Citation count
19
Captures
44