Datum prijs | 31 okt. 2016 |
---|---|
Originele taal | Engels |
Begeleider | E. Topan (Afstudeerdocent 1) & Zümbül Atan (Afstudeerdocent 2) |
Forecasting and planning long-term required capacity in a make-to-build high tech industry
Scriptie/Masterproef: Master