Datum prijs | 29 sep. 2020 |
---|---|
Originele taal | Engels |
Begeleider | Qi Han (Afstudeerdocent 1), Pieter Pauwels (Afstudeerdocent 2) & Mike M. van Vliet (Externe coach) |
BIM-based building circularity assessment from the early design stages: a BIM-based framework for automating the building circularity assessment from different levels of a building’s composition and providing the decision-making support on the design of the circular building from the early design stages
Scriptie/Masterproef: Master