BIM-based building circularity assessment from the early design stages
: a BIM-based framework for automating the building circularity assessment from different levels of a building’s composition and providing the decision-making support on the design of the circular building from the early design stages

  • J. Zhai

Scriptie/Masterproef: Master

Datum prijs29 sep. 2020
Originele taalEngels
BegeleiderQi Han (Afstudeerdocent 1), Pieter Pauwels (Afstudeerdocent 2) & Mike M. van Vliet (Externe coach)

Citeer dit

'