The effect of workload control on order flow times

    Onderzoeksoutput: Hoofdstuk in Boek/Rapport/CongresprocedureConferentiebijdrageAcademic

    31 Downloads (Pure)

    Samenvatting

    Situations where single components are manufactured with a relatively high frequency, where production capacity can be considered as homogeneous and where the manufacturing of a component requires the performance of a relatively large number of successive operations are considered. A model is presented of the dynamic behaviour of the system on an aggregate level. For two control modes, the variance and the steady state deviation of the order flow time from the norm is calculated. Typical differences are revealed between workload control by means of capacity variations and by means of order release variations. It is shown that the flow-time norm is a major determinant of the control effectiveness
    Originele taal-2Engels
    TitelOperational Research '81 : proceedings of the Ninth IFORS International Conference
    RedacteurenJ.P. Brans
    Plaats van productieAmsterdam, Netherlands
    UitgeverijNorth-Holland Publishing Company
    Pagina's779-789
    ISBN van geprinte versie0-444-86223-4
    StatusGepubliceerd - 1981

    Vingerafdruk Duik in de onderzoeksthema's van 'The effect of workload control on order flow times'. Samen vormen ze een unieke vingerafdruk.

  • Citeer dit

    Bertrand, J. W. M. (1981). The effect of workload control on order flow times. In J. P. Brans (editor), Operational Research '81 : proceedings of the Ninth IFORS International Conference (blz. 779-789). North-Holland Publishing Company.