Samenvatting
Electrification of marine transport is a promising solution to reduce sector greenhouse gas emissions and operational costs. However, the large upfront cost of electric vessels and the required charging infrastructure can be a barrier to the development of this technology. Optimization algorithms that jointly design the charging infrastructure and the operation of electric vessels can help to reduce these costs and make these projects viable. In this paper, we present a mixed-integer linear programming optimization framework that jointly schedules ferry operations, charging infrastructure and ship battery size. We analyze our algorithms with the case of the China Zorrilla, the largest electric ferry in the world, which will operate between Buenos Aires and Colonia del Sacramento in 2025. We find that the joint system and operations design can reduce the total costs by 7.8\% compared to a scenario with fixed power limits and no port energy management system.
| Originele taal-2 | Engels |
|---|---|
| Uitgever | arXiv.org |
| Aantal pagina's | 6 |
| Volume | 2603.29851 |
| DOI's | |
| Status | Gepubliceerd - 31 mrt. 2026 |
Bibliografische nota
submitted to 2025 IEEE Electric Ship Technologies SymposiumDuurzame ontwikkelingsdoelstellingen van de VN
Deze output draagt bij aan de volgende duurzame ontwikkelingsdoelstelling(en)
-
SDG 14 – Leven onder water
Trefwoorden
- eess.SY
Vingerafdruk
Duik in de onderzoeksthema's van 'Simultaneous Optimization of Electric Ferry Operations and Charging Infrastructure'. Samen vormen ze een unieke vingerafdruk.Citeer dit
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver