Samenvatting
We consider the open shop, job shop, and flow shop scheduling problems with integral processing times. We give polynomial-time algorithms to determine if an instance has a schedule of length at most 3, and show that deciding if there is a schedule of length at most 4 is NP-complete. The latter result implies that, unless P=NP, there does not exist a polynomial-time approximation algorithm for any of these problems that constructs a schedule with length guaranteed to be strictly less than 5/4 times the optimal length. This work constitutes the first nontrivial theoretical evidence that shop scheduling problems are hard to solve even approximately.
| Originele taal-2 | Engels |
|---|---|
| Pagina's (van-tot) | 288-294 |
| Aantal pagina's | 7 |
| Tijdschrift | Operations Research |
| Volume | 45 |
| Nummer van het tijdschrift | 2 |
| DOI's | |
| Status | Gepubliceerd - 1997 |
Vingerafdruk
Duik in de onderzoeksthema's van 'Short shop schedules'. Samen vormen ze een unieke vingerafdruk.Citeer dit
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver