Scheduling with sequence dependent setup times in application to Magnetic Resonance Imaging scans processing

E. Ivanov, A.Y. Pogromski, J.E. Rooda

    Onderzoeksoutput: Hoofdstuk in Boek/Rapport/CongresprocedureConferentiebijdrageAcademicpeer review

    5 Citaten (Scopus)

    Samenvatting

    We describe an algorithm for solving a single machine scheduling problem with additional assumptions motivated by Magnetic Resonance Imaging (MRI) Systems. In the operating model, the setup times are sequence dependent and the objective is to minimize the total production time. An application of the algorithm to the real MRI examination results in an increase of the scanner workfow.
    Originele taal-2Engels
    TitelProceedings of the 3rd IEEE Multi-conference on Systems and Control (MSC 2009), 8-10 july 2009, St. Petersburg, Russia
    Plaats van productiePiscataway
    UitgeverijInstitute of Electrical and Electronics Engineers
    Pagina's867-872
    ISBN van geprinte versie978-1-4244-4601-8
    DOI's
    StatusGepubliceerd - 2009

    Vingerafdruk

    Duik in de onderzoeksthema's van 'Scheduling with sequence dependent setup times in application to Magnetic Resonance Imaging scans processing'. Samen vormen ze een unieke vingerafdruk.

    Citeer dit