Samenvatting

As a consequence of the increasing amount of PV-systems connected to the LV-network the question arises whether these networks are able to cope with large amounts of PV. In this paper it is investigated whether problems have to be expected in typical LV networks in the Netherlands. It is shown that exceeding of the regulatory voltage levels is the first limiting factor for integration of PV, followed by overloading of components. In most parts of the network no problems will arise as a consequence of PV, as it is not possible to place enough PV panels to cause problems. Areas with increased risk can be identified on forehand.
Originele taal-2Engels
TitelProceedings of the 7th IEEE Young Researchers Symposium, 24-25 April 2014, Ghent, Belgium
Pagina's1-5
StatusGepubliceerd - 2014
Evenement7th IEEE Young Researchers Symposium in Electrical Power Engineering (YRS 2014), April 24-25, 2014, Ghent, Belgium - Ghent, België
Duur: 24 apr 201425 apr 2014

Congres

Congres7th IEEE Young Researchers Symposium in Electrical Power Engineering (YRS 2014), April 24-25, 2014, Ghent, Belgium
Verkorte titelYRS 2014
Land/RegioBelgië
StadGhent
Periode24/04/1425/04/14
AnderIEEE Young Researchers Symposium (YRS 2014)

Vingerafdruk

Duik in de onderzoeksthema's van 'Maximum PV-penetration in low-voltage cable networks'. Samen vormen ze een unieke vingerafdruk.

Citeer dit