Samenvatting
This paper deals with the materials flow to the building site and how to make it meet the requirements of right quality, quantity, time and place. It offers a way to systematically map materials flow to the building site and send the right information to the supplier in order to get the right materials to the building site.
Originele taal-2 | Engels |
---|---|
Pagina's (van-tot) | 139-146 |
Aantal pagina's | 8 |
Tijdschrift | Engineering, Construction and Architectural Management |
Volume | 1 |
Nummer van het tijdschrift | 2 |
DOI's | |
Status | Gepubliceerd - 1 feb. 1994 |