Doorgaan naar hoofdnavigatie Doorgaan naar zoeken Ga verder naar hoofdinhoud

Heat and smoke removal in semi-open car parks

Onderzoeksoutput: Hoofdstuk in Boek/Rapport/CongresprocedureConferentiebijdrageAcademicpeer review

Samenvatting

If a design of a semi-open car park without any mechnically ventilation system doesn’t meet the functional requirements stated in the Dutch building code directly, it is possible to show that the created design has an equal fire safety level as meant by this regulation. However it is questionable if the current guidelines meant to show this equivalence, will ensure a satisfactory amount of ventilation in case of a car park fire, for every situation. In this paper a study is presented in which the fire safety level of semi-open car parks is analyzed by the use of different variants which are assessed on the fire safety level by validated Computational Fluid Dynamics (CFD) simulations.
Originele taal-2Engels
TitelPaper presented at the IBPSA-NVL 2010 Event, Ontmoeting tussen praktijk en wetenschap : simulatie voor energie-efficiente of energie producerende gebouwde omgeving Eindhoven, 14 Oktober, 2010
Pagina's1-11
StatusGepubliceerd - 2010

Vingerafdruk

Duik in de onderzoeksthema's van 'Heat and smoke removal in semi-open car parks'. Samen vormen ze een unieke vingerafdruk.

Citeer dit