Approval procedures and consensus for building transmission lines: obstacles and solutions

A.R. Ciupuliga, M. Gibescu, W.L. Kling, G. Migliavacca, A. L'Abbate, K. Jansen, G. De-Saint-Martin, C. Vergine, K. Reich

Onderzoeksoutput: Hoofdstuk in Boek/Rapport/CongresprocedureConferentiebijdrageAcademicpeer review

3 Citaten (Scopus)
3 Downloads (Pure)

Samenvatting

This paper proposes a new approach - set up within the REALISEGRID research project - for speeding up approval procedures for building transmission infrastructure. The experiences of Transmission System Operators from Netherlands, Italy, France, Austria and Germany are studied in order to generalize and pinpoint the main weaknesses and strengths of current approval procedures. Recommendations concerning how to reduce the time needed for approval procedures are made. The problem of consensus improvement is also analysed. Suggestions for better structuring of the decision process in transmission planning, with high involvement of stakeholders, are made. A systemic approach for speeding up authorization procedures is proposed by combining the country survey and the consensus improvement findings. Actions are defined on different time horizons.
Originele taal-2Engels
TitelProceedings of the 8th International Conference on the European Energy Market (EEM 2011), 25-27 May 2011, Zagreb, Croatia
RedacteurenM. Delimar
Plaats van productiePiscataway
UitgeverijInstitute of Electrical and Electronics Engineers
Pagina's426-431
DOI's
StatusGepubliceerd - 2011
Evenement8th International Conference on the European Energy Market (EEM 2011) - Zagreb, Kroatië
Duur: 25 mei 201127 mei 2011
Congresnummer: 8
http://www.eem11.com/

Congres

Congres8th International Conference on the European Energy Market (EEM 2011)
Verkorte titelEEM 2011
Land/RegioKroatië
StadZagreb
Periode25/05/1127/05/11
Ander8th International Conference on the European Energy Market (EEM 2011), Zagreb, Croatia
Internet adres

Vingerafdruk

Duik in de onderzoeksthema's van 'Approval procedures and consensus for building transmission lines: obstacles and solutions'. Samen vormen ze een unieke vingerafdruk.