Agile development process and user-centric data driven design for an integrated energy system

Muhammad Babar, Martijn Roos, Phuong Nguyen

Onderzoeksoutput: Hoofdstuk in Boek/Rapport/CongresprocedureConferentiebijdrageAcademicpeer review

55 Downloads (Pure)

Samenvatting

Now the design of energy system requires needowners to play an active role by using advanced technical solutions to improve their responsiveness, process adaptability and empower end-users. Although need-owners via Demand Response (DR) has gain sufficient strategic improvement in energy management recently, there are still some fundamental impediments to achieve a trade-off between demand flexibility scheduling and dispatch. To find a solution to the challenge, the paper introduces the steps of an agile development process for energy systems, refers to a co-creation of solutions based on co-existing technologies and iterative development, where needowners requirements and solutions evolve through collaboration between cross-functional intelligent agents. The proof-of-the-concept is investigated by agent-oriented simulation for a generic low-voltage network of the Netherlands, which encounters transformer congestion. Simulation results reveal a significant reduction in congestion over a year while confirming expected levels of performance.

Originele taal-2Engels
Titel2019 IEEE International Conference on Environment and Electrical Engineering and 2019 IEEE Industrial and Commercial Power Systems Europe (EEEIC / I&CPS Europe)
Plaats van productiePiscataway
UitgeverijInstitute of Electrical and Electronics Engineers
Aantal pagina's6
ISBN van elektronische versie9781728106526
DOI's
StatusGepubliceerd - 1 aug 2019
Evenement19th IEEE International Conference on Environment and Electrical Engineering and 2019 IEEE Industrial and Commercial Power Systems Europe, EEEIC/I and CPS Europe 2019 - Genoa, Italië
Duur: 11 jun 201914 jun 2019

Congres

Congres19th IEEE International Conference on Environment and Electrical Engineering and 2019 IEEE Industrial and Commercial Power Systems Europe, EEEIC/I and CPS Europe 2019
LandItalië
StadGenoa
Periode11/06/1914/06/19

Vingerafdruk Duik in de onderzoeksthema's van 'Agile development process and user-centric data driven design for an integrated energy system'. Samen vormen ze een unieke vingerafdruk.

Citeer dit