Samenvatting
We consider a physical asset consisting of complex systems, where the systems may require upgrades during the lifetime of the asset. In practice, the asset owner and system supplier can make the upgrade decisions together, requiring a decision-support model that can be jointly used to optimize the total benefit for both parties. Motivated by a real-life use case including an asset owner and a system supplier, we build a continuous-time model to optimize the upgrade decisions of a system during the fixed lifetime of the asset. In our model, we capture the key critical factors that drive the upgrade decisions: increasing functionality requirements due to evolving technology, age-dependent maintenance costs, a predetermined overhaul plan of the asset, and the lifetime of the asset. A system upgrade is less costly if it is executed jointly with an asset overhaul. We first analyze the case with no additional cost of upgrading outside an overhaul. We analytically characterize the structure of the optimal upgrade policy under various realistic assumptions that lead to different types of cost functions. We then use these results as a building block to characterize the optimal policy for a generalized cost function. When there is a penalty for upgrading outside an overhaul moment, we propose a dynamic programming approach that efficiently determines the optimal upgrade policy by using our analytical results. We also prove that as this penalty increases, the optimal policy can only change to one where the number of upgrades not jointly executed with overhauls is reduced. However, the optimal number of upgrades is a nonincreasing function of this penalty. Also, surprisingly, more overhauls may lead to a smaller number of upgrades under the optimal policy.
Originele taal-2 | Engels |
---|---|
Pagina's (van-tot) | 212-232 |
Aantal pagina's | 21 |
Tijdschrift | Service Science |
Volume | 15 |
Nummer van het tijdschrift | 3 |
DOI's | |
Status | Gepubliceerd - 1 sep. 2023 |
Financiering
Funding:This publication is part of the project “Maritime Remote Control Tower for Service Logistics Innovation (MARCONI)” (project 439.18.309) of the research program “Integrator-Logistics as Enabler for Enhancing Society,” which is (partly) financed by the Dutch Research Council (NWO).
Financiers | Financiernummer |
---|---|
Nederlandse Organisatie voor Wetenschappelijk Onderzoek |
Vingerafdruk
Duik in de onderzoeksthema's van 'After-Sales Services During an Asset’s Lifetime: Collaborative Planning of System Upgrades'. Samen vormen ze een unieke vingerafdruk.Pers/Media
-
New Service Science Findings from Eindhoven University of Technology Outlined (After-sales Services During an Asset?s Lifetime: Collaborative Of)
van Houtum, G.-J. J. A. N., Sloothaak, F. & Akcay, A.
26/04/23
1 item van Media-aandacht
Pers / media: Vakinhoudelijk commentaar