A resource constrained project scheduling problem with multi-modes

C. Altintas, Meral Azizoglu

Onderzoeksoutput: Bijdrage aan tijdschriftTijdschriftartikelAcademicpeer review

Uittreksel

In this study, the authors consider a project scheduling problem with a single non-renewable resource. The authors assume that the resource is released at scheduled times and specified quantities and the resource is consumed at activity completion. The activities can be processed at different modes where a mode is defined by a processing time and a resource requirement amount. The problem is to select the modes and timings of the activities so as to minimize the project completion time. The authors give a mixed integer linear programming model and discuss some variable elimination mechanisms to enhance its efficiency.
Originele taal-2Engels
Artikelnummer4
Pagina's (van-tot)55-70
Aantal pagina's16
TijdschriftInternational Journal of Information Technology Project Management
Volume11
Nummer van het tijdschrift1
DOI's
StatusGepubliceerd - 2020

Vingerafdruk

Linear programming
scheduling
Scheduling
Processing
resources
programming
efficiency
Resources
Resource-constrained project scheduling
time
Non-renewable resources
Project scheduling
Mixed integer linear programming

Citeer dit

@article{7e902301cbe34c139a7107b322276150,
title = "A resource constrained project scheduling problem with multi-modes",
abstract = "In this study, the authors consider a project scheduling problem with a single non-renewable resource. The authors assume that the resource is released at scheduled times and specified quantities and the resource is consumed at activity completion. The activities can be processed at different modes where a mode is defined by a processing time and a resource requirement amount. The problem is to select the modes and timings of the activities so as to minimize the project completion time. The authors give a mixed integer linear programming model and discuss some variable elimination mechanisms to enhance its efficiency.",
keywords = "Multi-Modes, Non-Renewable Resource, Programming Model, Project Scheduling",
author = "C. Altintas and Meral Azizoglu",
year = "2020",
doi = "10.4018/IJITPM.2020010104",
language = "English",
volume = "11",
pages = "55--70",
journal = "International Journal of Information Technology Project Management",
issn = "1938-0232",
publisher = "IGI Global Publishing",
number = "1",

}

A resource constrained project scheduling problem with multi-modes. / Altintas, C.; Azizoglu, Meral.

In: International Journal of Information Technology Project Management, Vol. 11, Nr. 1, 4, 2020, blz. 55-70.

Onderzoeksoutput: Bijdrage aan tijdschriftTijdschriftartikelAcademicpeer review

TY - JOUR

T1 - A resource constrained project scheduling problem with multi-modes

AU - Altintas, C.

AU - Azizoglu, Meral

PY - 2020

Y1 - 2020

N2 - In this study, the authors consider a project scheduling problem with a single non-renewable resource. The authors assume that the resource is released at scheduled times and specified quantities and the resource is consumed at activity completion. The activities can be processed at different modes where a mode is defined by a processing time and a resource requirement amount. The problem is to select the modes and timings of the activities so as to minimize the project completion time. The authors give a mixed integer linear programming model and discuss some variable elimination mechanisms to enhance its efficiency.

AB - In this study, the authors consider a project scheduling problem with a single non-renewable resource. The authors assume that the resource is released at scheduled times and specified quantities and the resource is consumed at activity completion. The activities can be processed at different modes where a mode is defined by a processing time and a resource requirement amount. The problem is to select the modes and timings of the activities so as to minimize the project completion time. The authors give a mixed integer linear programming model and discuss some variable elimination mechanisms to enhance its efficiency.

KW - Multi-Modes

KW - Non-Renewable Resource

KW - Programming Model

KW - Project Scheduling

U2 - 10.4018/IJITPM.2020010104

DO - 10.4018/IJITPM.2020010104

M3 - Article

VL - 11

SP - 55

EP - 70

JO - International Journal of Information Technology Project Management

JF - International Journal of Information Technology Project Management

SN - 1938-0232

IS - 1

M1 - 4

ER -