Samenvatting
In this article the decision behaviour of four production schedulers in a truck manufacturing company is investigated by means of a quantitative model. The model consists of there parts: performance variables, action variables and disturbance variables. The outcomes show that there is a large difference between schedulers that apparently have the same type of decision problem. Another interesting finding is that some scheduling actions work positively in the short term, but negatively over a longer term. Other results, along with methodological issues of quantitative research, are discussed.
Originele taal-2 | Engels |
---|---|
Pagina's (van-tot) | 383-392 |
Tijdschrift | Production Planning & Control |
Volume | 7 |
Nummer van het tijdschrift | 4 |
DOI's | |
Status | Gepubliceerd - 1996 |