N2 - The rapid development of green buildings world widely has not delivered the anticipated energy related benefits because the real performance of green buildings is not as good as expected. This paper presents a building case study in China by applying a holistic approach which integrates system dynamics and energy performance simulation to evaluate the building performance gap and provide management strategies to minimize the performance gap. The case study in this paper is an office building located in Shanghai, which was awarded “Three Star” in Evaluation Standard for Green Buildings in China (GB/T 50378–2006). Several scenarios including six single management strategy scenarios and four multiple management strategy scenarios are carried out and in each scenario, building performance is analyzed qualitatively in terms of project quality (ranging from 0 to 1), and quantitatively in terms of energy use intensity (kWh/m2). The results of this case study are compared to another green office building located in the UK. The cross case mismatch between qualitative and quantitative results is due to four factors that performed better in reality that they were designed. It is demonstrated that multiple factors could help to increase building performance more than single factor especially when management cost was considered. The comparison of the two cases in China and the UK, shows that design factors should be treated in a more stringent way instead of referring values from local standard authorities only which could induce overdesign of the buildings.
AB - The rapid development of green buildings world widely has not delivered the anticipated energy related benefits because the real performance of green buildings is not as good as expected. This paper presents a building case study in China by applying a holistic approach which integrates system dynamics and energy performance simulation to evaluate the building performance gap and provide management strategies to minimize the performance gap. The case study in this paper is an office building located in Shanghai, which was awarded “Three Star” in Evaluation Standard for Green Buildings in China (GB/T 50378–2006). Several scenarios including six single management strategy scenarios and four multiple management strategy scenarios are carried out and in each scenario, building performance is analyzed qualitatively in terms of project quality (ranging from 0 to 1), and quantitatively in terms of energy use intensity (kWh/m2). The results of this case study are compared to another green office building located in the UK. The cross case mismatch between qualitative and quantitative results is due to four factors that performed better in reality that they were designed. It is demonstrated that multiple factors could help to increase building performance more than single factor especially when management cost was considered. The comparison of the two cases in China and the UK, shows that design factors should be treated in a more stringent way instead of referring values from local standard authorities only which could induce overdesign of the buildings.
KW - Building performance gap
KW - Energy simulation
KW - Framework
KW - Green building
KW - System dynamics
UR - http://www.scopus.com/inward/record.url?scp=85082718780&partnerID=8YFLogxK
U2 - 10.1016/j.buildenv.2020.106819
DO - 10.1016/j.buildenv.2020.106819
M3 - Article
AN - SCOPUS:85082718780
SN - 0360-1323
VL - 175
JO - Building and Environment
JF - Building and Environment
M1 - 106819
ER -