Thermal bottleneck determination in underground power cables
: methodology and tools to identify the weakest link

  • L.W. Klaasen

Student thesis: Master

Abstract

Date of Award31 Aug 2007
Original languageEnglish
SupervisorJ. Wetzer (Supervisor 1)

Cite this

'