The utilization of BIM-based as-planned and as-built scheduling data
: exploratory research into the capture, storage, analysis and (re)use of BIM-based as-planned and as-built scheduling data for the estimation of task durations for future construction projects

  • M. Wessel

Student thesis: Master

Date of Award29 Sept 2020
Original languageEnglish
SupervisorPieter Pauwels (Supervisor 1), Bob J.A. van Thiel (Supervisor 2), J.I. (Brigt) Rykkje (External coach) & Paul Hendrikx (External coach)

Cite this

'