The remanufacturing of endmills : a logistics structure to determine and realise reliable delivery times

  • L.M.L. Rutten

Student thesis: Master

Abstract

Date of Award30 Jun 2002
Original languageEnglish
SupervisorA.L.J. Geenen (Supervisor 1)

Cite this

The remanufacturing of endmills : a logistics structure to determine and realise reliable delivery times
Rutten, L. M. L. (Author). 30 Jun 2002

Student thesis: Master