Date of Award | 2014 |
---|---|
Original language | English |
Supervisor | H. Peng (Supervisor 1) & Geert-Jan J.A.N. van Houtum (Supervisor 2) |
The effect of imperfect inspections on cost optimal maintenance scheduled under a reliability constraint
Student thesis: Master