Date of Award | 31 Oct 2017 |
---|---|
Original language | English |
Supervisor | Bauke de Vries (Supervisor 1), J. Beetz (Supervisor 2), Tom Verhoeff (Supervisor 2), Peter Imbrechts (External coach) & Victor Malvar (External coach) |
The discovery of bottlenecks within the BIM design process by using process mining: the concept of process mining in combination with BIM models in the design phase of construction projects
Student thesis: Master