The discovery of bottlenecks within the BIM design process by using process mining
: the concept of process mining in combination with BIM models in the design phase of construction projects

  • C. van der Graaf

Student thesis: Master

Abstract

Date of Award31 Oct 2017
Original languageEnglish
SupervisorBauke de Vries (Supervisor 1), J. Beetz (Supervisor 2), Tom Verhoeff (Supervisor 2), Peter Imbrechts (External coach) & Victor Malvar (External coach)

Cite this

The discovery of bottlenecks within the BIM design process by using process mining: the concept of process mining in combination with BIM models in the design phase of construction projects
van der Graaf, C. (Author). 31 Oct 2017

Student thesis: Master