Date of Award | 30 Nov 2016 |
---|---|
Original language | English |
Supervisor | A.G. (Ton) de Kok (Supervisor 1) & Nico P. Dellaert (Supervisor 2) |
The design of planning algorithms for master production scheduling in a complex two-stage chemical batch-production process: a case study in the chemical plant P6D of Hilti AG
Student thesis: Master