Structuring spare parts inventory control at ASSET Rail

  • J.A.H. Toonen

Student thesis: Master

Abstract

Date of Award31 Oct 2015
Original languageEnglish
SupervisorMarco Slikker (Supervisor 1) & Rob J.I. Basten (Supervisor 2)

Cite this

'