Date of Award | 30 Sept 1997 |
---|---|
Original language | English |
Supervisor | Henny P.G. van Ooijen (Supervisor 1) |
Shop floor control in final testing manufacturing: the redesign process of the shop floor control structure at the test department of Philips Semiconductors Southampton (UK)
Student thesis: Master