Date of Award | 31 Aug 2012 |
---|---|
Original language | English |
Supervisor | Edwin Zondervan (Supervisor 1), J. Meuldijk (Supervisor 2) & Simme Douwe P. Flapper (Supervisor 2) |
Scheduling model: tested on emulsion polymerization production cases
Student thesis: Master