Date of Award | 31 Oct 2015 |
---|---|
Original language | English |
Supervisor | A.G. (Ton) de Kok (Supervisor 1) & Henny P.G. van Ooijen (Supervisor 2) |
Safety stock allocation in an assembly system with high rejection rate during production
Student thesis: Master