Date of Award | 31 Aug 2012 |
---|---|
Original language | English |
Supervisor | Geert-Jan J.A.N. van Houtum (Supervisor 1), Simme Douwe P. Flapper (Supervisor 2) & J.J. Arts (Supervisor 2) |
Repair shop and inventory control for spare parts: min-max versus a lead time interface agreement
Student thesis: Master