Date of Award | 31 Aug 2008 |
---|---|
Original language | English |
Supervisor | G.P. Kiesmuller (Supervisor 1) & T. Tan (Supervisor 2) |
Redesign of preventive maintenance practices by line replaceable units: application on an original equipment manufacturer
Student thesis: Master