Multi-item spare parts stocking to limit the number of extreme long downtimes

  • R.P.J. Groot

Student thesis: Master

Abstract

Date of Award27 Sep 2019
Original languageEnglish
SupervisorRob J.I. Basten (Supervisor 1), Geert-Jan J.A.N. van Houtum (Supervisor 2) & Douniel Lamghari-Idrissi (External coach)

Cite this

'