Date of Award | 14 Aug 2024 |
---|---|
Original language | English |
Supervisor | Ivo J.B.F. Adan (Supervisor 1), Q.V. (Vinh) Dang (Supervisor 2) & Jeroen B.H.C. Didden (Supervisor 2) |
Integration of finite resources in a multi-agent system for job shop scheduling
Student thesis: Master