Improving workflow in lean construction
: design for construction (DFC) as a solution for waste elimination in a Lean construction pilot project 'Sporen in Arnhem'

  • R.H. Boschker

Student thesis: Master

Abstract

Date of Award31 Oct 2013
Original languageEnglish
SupervisorJos J.N. Lichtenberg (Supervisor 1), Wim J.M.J. van den Bouwhuijsen (Supervisor 2), M.P. Kursten (Supervisor 2) & N.B. Scholten (External coach)

Cite this

'