Date of Award | 31 Oct 2013 |
---|---|
Original language | English |
Supervisor | J.J.N. Lichtenberg (Supervisor 1), Wim J.M.J. van den Bouwhuijsen (Supervisor 2), M.P. Kursten (Supervisor 2) & N.B. Scholten (External coach) |
Improving workflow in lean construction: design for construction (DFC) as a solution for waste elimination in a Lean construction pilot project 'Sporen in Arnhem'
Student thesis: Master