Date of Award | 30 Oct 2017 |
---|---|
Original language | English |
Supervisor | J. Beetz (Supervisor 1), T.F. Krijnen (Supervisor 2) & Leon C.M. Leenders (External coach) |
Improving the management of structural engineering requirements in the design phase: linking project requirements to BIM, based on the semantic web and linked data principles
Student thesis: Master