Improving the accuracy of project duration with artificial intelligence
: a case study within the utility construction industry

  • T. Azaaj

Student thesis: Master

Abstract

Date of Award26 Feb 2019
Original languageEnglish
SupervisorBauke de Vries (Supervisor 1), Aant van der Zee (Supervisor 2) & Tao Feng (Supervisor 2)

Cite this

Improving the accuracy of project duration with artificial intelligence: a case study within the utility construction industry
Azaaj, T. (Author). 26 Feb 2019

Student thesis: Master