Date of Award | 31 Aug 1993 |
---|---|
Original language | English |
Supervisor | M.J.M. Heijligers (Supervisor 1) |
High-level synthesis scheduling using fuzzy set techniques
Student thesis: Master
Student thesis: Master
Date of Award | 31 Aug 1993 |
---|---|
Original language | English |
Supervisor | M.J.M. Heijligers (Supervisor 1) |