Fall hazard prevention system in an early design stage with BIM
: a flowcart for implementing IFC

  • D. Bolte

Student thesis: Master

Date of Award26 Mar 2019
Original languageEnglish
SupervisorBauke de Vries (Supervisor 1), Aant van der Zee (Supervisor 2), Luuk Wijnholts (Supervisor 2), Jeroen Mackaij (External coach) & M. Klep (External coach)

Cite this

'