Date of Award | 31 May 2015 |
---|---|
Original language | English |
Supervisor | E. Topan (Supervisor 1) & Anna Wilbik (Supervisor 2) |
Development of a repair cost calculation model for DAF Trucks N.V. using the CRISP-DM framework
Student thesis: Master