Developing a framework for optimizing inspection intervals for a large installed asset base

  • T.H.F.M. de Groof

Student thesis: Master

Date of Award31 May 2010
Original languageEnglish
SupervisorA.M.H. Elwany (Supervisor 1) & Simme Douwe P. Flapper (Supervisor 2)

Cite this

'