Date of Award | 30 Sept 2015 |
---|---|
Original language | English |
Supervisor | F.J.P. Karsten (Supervisor 1) & Nico P. Dellaert (Supervisor 2) |
Determination of material requirement changes of a demand proposition before an MRP run: a case study at Philips Healthcare MR
Student thesis: Master