Date of Award | 30 Apr 2007 |
---|---|
Original language | English |
Supervisor | A.J. van Weele (Supervisor 1) |
Design of a planning and control framework for a pre engineered steel building manufacturer for construction projects: an analytical study of the supply chain of Mammut Building Systems
Student thesis: Master