Design of a planning and control framework for a pre engineered steel building manufacturer for construction projects
: an analytical study of the supply chain of Mammut Building Systems

  • K. van Roosmalen

Student thesis: Master

Date of Award30 Apr 2007
Original languageEnglish
SupervisorA.J. van Weele (Supervisor 1)

Cite this

'