Date of Award | 29 Mar 2016 |
---|---|
Original language | English |
Supervisor | J. Beetz (Supervisor 1), Arno D.C. Pronk (Supervisor 2), M. Schlaghecke (External coach) & F.M. Maria (External coach) |
Deriving building information models from legacy paper drawings: investigating the scope and limitation for BIM usage on existing buildings
Student thesis: Master